After drilling shafts and setting steel H-beams in concrete, we connect those beams with timber or concrete lagging to build a retaining wall.
The lagging resists the load of the retained soil and transfers it to the piles. Depending on the situation, we may also install tiebacks beyond the failure point for added strength.